Thirsk and Malton Area Planning Committee  

Update

 

17 July 2025

 

Agenda

Item

Application number and Division

Respondent

 

4

ZE24/00112/MFUL Norton

 

 

Yorkshire Water

 

 

 

Yorkshire Water have responded and raised no objection to the amended landscape plans, subject to a condition.  Condition 25 on the report already covers but requires amending to insert the words (Issue P05).

 

Condition 25 should now read:

 

The development hereby permitted shall be carried out in accordance with the following requirements measures set out in the Flood Risk and Drainage Assessment P21-173-HYD-XX-XX-RP-C-0500 (Issue P05) dated 27 March 2025:

·         Finished floor levels shall be set no lower than 20.287 metres above Ordnance Datum (AOD).

·         Compensatory storage shall be provided as detailed in the flood risk assessment.

·         The applicant should also implement the flood resilient / flood proof construction techniques as detailed in the mitigation section of the FRA.

·         Reason:

·         To reduce the risk of flooding to the proposed development and future occupants and to prevent flooding elsewhere by ensuring that compensatory storage of flood water is provided.