Thirsk and Malton Area Planning Committee
Update
17 July 2025
|
Agenda Item |
Application number and Division |
Respondent |
|
|
4 |
ZE24/00112/MFUL Norton
|
Yorkshire Water
|
Yorkshire Water have responded and raised no objection to the amended landscape plans, subject to a condition. Condition 25 on the report already covers but requires amending to insert the words (Issue P05).
Condition 25 should now read:
The development hereby permitted shall be carried out in accordance with the following requirements measures set out in the Flood Risk and Drainage Assessment P21-173-HYD-XX-XX-RP-C-0500 (Issue P05) dated 27 March 2025: · Finished floor levels shall be set no lower than 20.287 metres above Ordnance Datum (AOD). · Compensatory storage shall be provided as detailed in the flood risk assessment. · The applicant should also implement the flood resilient / flood proof construction techniques as detailed in the mitigation section of the FRA. · Reason: · To reduce the risk of flooding to the proposed development and future occupants and to prevent flooding elsewhere by ensuring that compensatory storage of flood water is provided.
|