Recommendations
i.
that Executive approves £2.5 million in capital
funding to enable the gas cremators at Woodlands Crematorium in Scarborough to
be replaced, like for like, with new upgraded ones.
ii. that this project is funded through NYC’s Strategic Capacity Reserve.
Minutes:
Considered a report of the Corporate Director of Environment seeking approval for £2.5 million capital funding to replace the existing gas cremators at the council’s Woodlands Crematorium in Scarborough. Introducing the report, the Executive Member for Managing our Environment, Councillor Richard Foster commented that replacing with like-for-like, upgraded gas cremators was the most cost-effective option that would cause less risk of service disruption of this much valued and long-established facility for the local community. The sound commercial sense of this option was also noted.
Resolved (unanimously) that
Reasons for recommendations
A decision to approve the capital funding for the Woodlands cremator replacement project will safeguard the long-term future of Woodlands Crematorium for at least 20 years. This will continue a much-valued service for NYC’s coastal communities that has been established for the last 65 years.
Alternative options considered
Property Services and the Bereavement Service submitted an appraisal
using a scoring matrix with the project proposal for capital board approval, as
reproduced in Appendix A. The appraisal assessed the
following criteria: Desirability, Feasibility, and Viability. The
assessment recommended gas as the preferred solution for the cremator
replacement.
A summary of the reasons why Capital Board
supported this option were as follows:
·
gas-only replacement (like-for-like) with a
programme of phased work to ensure the crematorium remains operational
·
due to the existing building design, replacement
cremators and associated plant equipment will follow a ‘like-for-like’ installation
strategy, (gas burners) located within the current technical areas of the
crematorium
·
replacing existing gas cremators
like-for-like is the most cost-effective option – when
we consider the additional necessary electrical infrastructure
upgrade required to the site to support the latter options and the
need for a temporary cremator during the construction phase
·
replacing with
like-for-like, upgraded gas cremators will provide
energy savings compared to the existing cremators, due to technological
advancement in this cremation process over the last 20 years
·
the cremation process using gas is shorter in
duration by an average of 30 minutes to one hour compared
to the electric option
·
the risks of service disruption
during the construction phase of the project are lower for the
like-for-like gas replacement option, compared to the other
options.
The discounted options were:
·
electric-only replacement, requiring a power supply
upgrade and temporary cremator hire, all additional costs, which provide a
higher risk of service disruption. The total estimated costs of replacing gas
with electric cremators is approximately double the cost of gas cremators at
£3million (not including any prelims, contingency or fees). Furthermore,
feedback from staff at Maple Park Crematorium who operate an electric only
cremator, is that they have experienced issues with extended down time during
annual servicing, delays in repairs, with contractors travelling from mainland
Europe and minimal heat control on the cremator
·
hybrid cremators (gas/electric elements) -
operational issues as electric cremators. Plus, hybrid models are an unknown
technology with minimal installations in the UK
·
hybrid cremators (gas elements only),
adaptable to electric when funding becomes available - operational issues as
outlined above with power upgrade costs deferred to a later date
·
defer all proposed works. Increased risk of cremator
failure and continued repair costs.