Decision Maker: Assistant Director - Highways and Transportation, Parking Services, Parks & Grounds
Decision status: Recommendations Approved
Is Key decision?: Yes
Is subject to call in?: Yes
To seek approval for award of contract for
Waltonwrays - general maintenance works of £532,951 to PBS
Construction Limited.
The award of contract to Waltonwrays - General
Maintenance works for £532,951.00 to PBS Construction
Limited.
A procurement exercise was carried out through
the Civils Framework. Two bids were with PBS being cheapest. Due to
tight window of working for environmental conditions, start date is
29 July with works to Span2 (the main span over the river), needing
to be completed by the end of September. No time to retender for a
lower cost.
Delay the works till next year, by which time
more corrosion will be present upon the beams. The joints in the
road are at the end of their life. A temporary repair temp was
undertaken on site when surveying the joints due to a large pothole
appearing next to the joints caused by water ingress.
Consider painting only the heavily corroded areas at the half
joints. Painting the whole structure would increase the longevity
of the bridge through providing a protective cover for the steel
beams. Our preferred option would be to paint the whole of the
beams now, as well as the bearings, to prolong the life of the
structure.
Publication date: 15/07/2024
Date of decision: 15/07/2024
Effective from: 23/07/2024
Accompanying Documents: