Decision Maker: Assistant Director - Economic Development, Regeneration, Tourism & Skills
Decision published: 14/08/2023
Effective from: 16/03/2023
Decision:
13/03/23/NYCC - A waiver of contract procedure
rules was signed by Barry Khan and Gary Fielding that started a
seamless contract award was possible to ensure the continuation of
an inactive individuals support programme through Better
Connect.
The recommendation was to award a contract to Better Connect for a
period of 12 months only to provide the management and coordination
of the Action Towards Inclusion VCS partnership of providers to
ensure this service and VCS delivery organisations is not at risk
from the withdrawal of ESF funding and can continue delivering key
worker and wrap around employability support to inactive
individuals across North Yorkshire.
This decision has allowed for the continuation of the programme to
ensure client and sub-providers were able to continue with their
service and support - continue with excellent outcome result and
performance.
Better Connect were awarded the contract on the understanding that
the existing 20 providers through which the work was sub-contracted
and delivered, would continue/develop their work for existing and
new clients over the course of the 12 months (23/24).
Better Connect’s (through an agreed and fixed fee) role has
expanded to include:
- Acting as the accountable body for the programme
- Partnership profiling and development
- Grant criteria, monitoring form and evaluation development
- Delivery of partner training workshops
- Ongoing partner support and performance management
- Programme marketing and promotion
- Monitoring and financial paperwork verification
- Financial claims processing
- Partner payment calculations
- Internal and external audit management
- Programme storage and archive
- Strategic liaison with funders and stakeholders
The value of the contract with Better Connect is:
£210,068
Lead officer: Marie Woodhouse
Decision Maker: Assistant Director - Education and Skills
Decision published: 11/05/2023
Effective from: 30/03/2023
Decision:
The Authority has awarded a contract to FFT
Education Limited to provide pupil and school performance data
analysis through GCloud 13 Framework.
The new contract is to commence on the 1 April 2023 for an initial
period of 12 months.
Lead officer: Julie Robinson
Decision Maker: Assistant Chief Executive - Legal and Democratic Services
Decision published: 09/05/2023
Effective from: 29/03/2023
Decision:
The award of a contract to Thomson Reuters for
the provision of a broad range of reference material, case law, and
expert information for Legal Services.
The contract is for 12 months starting on 1 April 2023 until 31
March 2024. No extensions are available.
The contract value is £95,689.05 (exc VAT).
Lead officer: Julie Robinson
Decision Maker: Corporate Director of Business and Environmental Services
Decision published: 03/05/2023
Effective from: 27/03/2023
Decision:
That the Authority re-affirms the stance
approved on 27 November 2020, and based on the evidence available
at this time, to support confirmation of the Order within the
Authority’s submission of this opposed Definitive Map
Modification Order (DMMO) to the Secretary of State
(SoS).
Lead officer: Tricia Richards
Decision Maker: Corporate Director of Business and Environmental Services
Decision published: 03/05/2023
Effective from: 27/03/2023
Decision:
The approval for 25 additional new schemes up
to the value of £1.38M, as detailed in Appendix 1 of the
report to be included within the Highways Capital Forward Programme
(HCFP).
As implementation of an earlier Key Decision on 27 May 2022 and as
a non key decision by an officer, is NOT open to call in.
Lead officer: Tricia Richards
Decision Maker: Corporate Director of Business and Environmental Services
Decision published: 03/05/2023
Effective from: 27/03/2023
Decision:
Approval of Community Transport capital grants
to Hambleton Community Action and the Sherburn Visiting
Scheme.
Lead officer: Tricia Richards
Decision Maker: Corporate Director of Business and Environmental Services
Decision published: 02/05/2023
Effective from: 27/03/2023
Decision:
Approval of proposals for charges made for
services provided by Integrated Passenger Transport (IPT).
Lead officer: Tricia Richards
Decision Maker: Corporate Director of Business and Environmental Services
Decision published: 02/05/2023
Effective from: 27/03/2023
Decision:
To retain the existing Traffic Regulation
Order (TRO) of 1999 (7.5 tonne weight restriction in a zone
covering various roads in the Asenby, Rainton and Topcliffe area)
in its current form until 6 months following the completion of all
of the signage improvements on both the local road network (managed
by NYC) and the strategic road network (managed by National
Highways).
Lead officer: Tricia Richards
Decision Maker: Corporate Director of Strategic Resources
Decision published: 20/04/2023
Effective from: 01/03/2023
Decision:
The award of a contract for the technical
support and maintenance of MapInfo Pro a geographical information
system to CDR Group Ltd. Support for the system has been in place
since 1 May 2019, and the contract will run until 30 April 2024,
with the option for a 12-month extension.
The whole life cost is £115,000 (exc VAT).
Lead officer: Julie Robinson
Decision Maker: Corporate Director of Environment
Decision published: 18/04/2023
Effective from: 27/03/2023
Decision:
Approval agreed to publish the updated actions
arising from the published Section 19 Flood and Water Management
Act 2010 flood investigation reports on the Council's
website.
Lead officer: Tricia Richards
Decision Maker: Director of Public Health
Decision published: 18/04/2023
Effective from: 01/03/2023
Decision:
The provision of a Participation Support
Service between The North Yorkshire Council and Keyring Living
Support Networks, commenced on 1st April 2019 (Year 1) and the
contract will expire on 31st March 2024 (Year 5).
A variation to this contract has been agreed. The variation details
a backdated fee uplift of 3% from Year 2 and 3, and 3.10% in Year 4
and Year 5 of the contract
Lead officer: Dawn Day
Each year the local authority must publish a
post 16 policy statement on home to school transport by May
31st
This report is to recommend the contribution fees for both post 16
and spare seat (paid travel permits) for the 2023-24 Academic Year
which must be declared in the policy statement
Decision Maker: Corporate Director Children and Young People's Services
Decision published: 17/04/2023
Effective from: 26/04/2023
Decision:
To
1. Increase the post -16 charge in line with corporate inflation
uplift to £747.50
2. To implement the policy change and increase the charge for spare
seats
(paid permits) to £747.50 to match the Post -16 rate for
2023/2024 academic
year.
3. To continue to support the 50% reduction for families with a low
income.
Lead officer: Chris Reynolds
Decision Maker: Corporate Director of Environment
Decision published: 05/04/2023
Effective from: 16/03/2023
Decision:
UPDATE OF ORIGINAL KEY DECISION OF 16.03.2023
DISCLOSING CONFIDENTIAL INFORMATION AND THEREFORE NOT OPEN TO CALL
IN - Approval to carry out a procurement process to source a
supplier to deliver the Home Upgrade Grant scheme across North
Yorkshire.
Lead officer: Tricia Richards
Decision Maker: Assistant Director - Resources (CYPS)
Decision published: 04/04/2023
Effective from: 31/03/2023
Decision:
To Award a hire contract to Portakabin Ltd at
a value of £424,950.00 for temporary decant provision at
Welburn Hall School.
Lead officer: Julie Robinson
Decision Maker: Corporate Director of Strategic Resources
Decision published: 30/03/2023
Effective from: 30/03/2023
Decision:
The Corporate Director - Strategic Resources
in consultation with the Deputy Leader, the Monitoring Officer and
the Section 151 Officers of the District Councils has approved the
specific consents attached in Appendix 1 to the report.
Lead officer: Louise Heaps
Decision Maker: Corporate Director of Strategic Resources
Decision published: 30/03/2023
Effective from: 17/03/2023
Decision:
The approval of the Non-Domestic Rating
Discretionary Rate Relief Scheme by the Section 151 Officer, under
a specific delegation from the Executive on 5 July 2022:
“(iii) Discretionary reliefs wholly defined by the Government
and reimbursed by the Government under a S31 Grant
• that the Council adopts all S31 Government funded
discretionary reliefs in accordance with any guidelines
issued.
• That the Council’s s151 Officer be delegated the
authority to amend any such approach to ensure that any relief
granted is in line with the intentions of the Government and is
compatible with the Council’s objectives.”
Lead officer: Louise Heaps
Decision Maker: Assistant Director - Technology
Decision published: 30/03/2023
Effective from: 17/03/2023
Decision:
The decision has been taken to vary the
existing contract to add four additional portals as follows, from 1
April 2023 to 31 March 2027:
• Adults Portal (LL)
• LAS Delegation Portal (LL)
• Online Financial Assessment (OCC)
• Client Finance Portal (OCC)
Lead officer: Julie Robinson
This report is in relation to the re-
procurement of Office Furniture Removal, Storage and Disposal
Services. The current contract is due to expire 31 July 2023 and
the proposal is to advertise the opportunity via a competitive
procurement process advertised via Yortender portal.
Decision Maker: Assistant Director - Resources (CYPS)
Decision published: 29/03/2023
Effective from: 06/04/2023
Decision:
To proceed with a procurement of Office
Furniture Removal, Storage and Disposal Services via an open tender
process advertised on the Yortender platform for a period of 24
months starting on 1 August 2023 with two optional extension
periods of 12 months.
Lead officer: Charlotte Stolarski
Decision Maker: Assistant Director - Resources (CYPS)
Decision published: 29/03/2023
Effective from: 29/03/2023
Decision:
To undertake a procurement exercise for
re-roofing works at Alverton Community Primary School,
Northallerton and Bedale CE Primary School.
Lead officer: Julie Robinson
Decision Maker: Assistant Director - Resources (CYPS)
Decision published: 29/03/2023
Effective from: 29/03/2023
Decision:
To Award a construction contract to RH
Fullwood Ltd at a value of £279,383.88 for a classroom and
toilet extension at Foston Primary School.
Lead officer: Julie Robinson
To recommend the annual uplift in payments to
North Yorkshire Foster Carers that will take effect from 1 April
2023..
To also present an options appraisal of other possibilities to
increase payments to Foster Carers for the purposes of retention
and recruitment.
Decision Maker: Corporate Director Children and Young People's Services
Decision published: 29/03/2023
Effective from: 06/04/2023
Decision:
After consideration of the report and the
completed Equalities Impact Assessment and Climate Change Impact
Assessment it was agreed to raise Allowances, Premiums and Fees on
1 April 2023 by the rate of December CPI inflation applied to April
2022 payment levels
Accredited premiums and advanced/specialist Fees – To
increase the accredited premium by 15%
Additional Payments:
• Introduction of bridging payments to accredited Foster
Carers
• Pay the first 100 miles of transport
• Include Foster Carers in the Vivup Everybody Benefits
scheme
• Introduction of a ‘Recommend a Friend’ and
Golden Hello Scheme
Additionally, to keep Foster Carer payments under constant review.
This review to be mindful of the impact of additional payments on
both retention and recruitment.
Lead officer: Alan Tucker
To request that the Executive Member -
Highways and Transportation, after consultation, authorises the
Corporate Director - Strategic Resources to accept the Bikeability
Scheme Grant offer for 2023-224 of £186,165 from the
Department for Transport (DfT).
Decision Maker: Executive Member for Highways & Transportation
Decision published: 29/03/2023
Effective from: 06/04/2023
Decision:
To accept the DfT grant of £186,165
subject to approval of the terms and conditions by legal services
and approve the delivery and funding model outlined in Option 2 for
the 2023/24 Bikeability Scheme.
By whom: County Councillor Keane Duncan, Executive Member for
Highways & Transportation, following consultation with the Karl
Battersby, Corporate Director – Business and Environmental
Services, the Corporate Director – Strategic Resources and
the Assistant Chief Executive (Legal and Democratic Services) to
authorise the Corporate Director - Strategic Resources to accept
the DfT grant offer for 2023-24
Lead officer: Fiona Ancell
Decision Maker: Executive Member for Culture, Arts & Housing
Decision published: 27/03/2023
Effective from: 23/01/2023
Decision:
To delegate approval to accept the Home
Upgrade Grant Phase 2 (HUG2) to the Corporate Director Strategic
Resources in consultation with the Assistant Chief Executive Legal
and Democratic Services subject to acceptable terms and conditions
being received.
And
To delegate authority to the Corporate Director Strategic Resources
to sign the Memorandum of Understanding by 27.01.23 and the Data
Sharing Agreement by 03.02.23
Lead officer: Julie Robinson
To approve the proposed changes in fees and
charges for in-house community care services, plus meals, transport
and laundry services for 2022/23
Decision Maker: Corporate Director of Health and Adult Services
Decision published: 27/03/2023
Effective from: 01/04/2023
Decision:
Approval has been given for the new fees and
charges for in-house and community care services as outlined in
Section 3 of the report, tables 1 and 2 of the report to be
effective from 10 April 2023 for 2023/34.
Lead officer: Abigail Barron, Anton Hodge
To approve fees and annual uplift level for
2023/24
Decision Maker: Corporate Director of Health and Adult Services
Decision published: 27/03/2023
Effective from: 01/04/2023
Decision:
The proposed fees for residential, nursing,
domiciliary care and community based services have been agreed for
2023/24
(i) That fee increases to care homes for both residential and
nursing will be as below:
a) The four Actual Cost of Care (ACOC) rates for 2023/24 will be:
Residential 812, Residential/Dementia 854, Nursing 896 and
Nursing/Dementia 903.
b) The Cost of Care rate will be implemented for all existing
placements by April 2024 where they are currently paid below that
rate.
c) For those above the ACOC rate, inflation will be paid at 3% up
to £1,200 per week, with no inflation above that.
d) All new placements will be paid the ACOC rate, except in
exceptional circumstances and where agreed otherwise.
e) As ACOC rates only apply to placements for over-65s, placements
supporting adults under the age of 65 will be paid an inflation
rate of 9.2% for those below £1,000 per week and 3% for those
above.
f) Specialist residential placements for people over-65 costing
less than £1,000 per week will receive 9.2%, while those
above will receive 3%.
(ii) An 9.2% increase for Community-Based Support/non-regulated
services, including Day Services. This will be rounded up to ensure
it is divisible by 4.
(iii) For domiciliary care: 9.2% uplift to all domiciliary care
packages below £26 per hour. 3% for those between £26
and £33. No inflation will be paid on hourly rates above
£33.
(iv) Increases to supported living care packages will be
9.2%.
(v) For placements of people in care homes outside of North
Yorkshire County Council we will honour an uplift agreed by the
host authority where they have undertaken an Actual Cost of Care
exercise, and will consider individual business cases where there
is no Actual Cost of Care exercise in place.
Lead officer: Abigail Barron, Anton Hodge
To agree and approve the Market Sustainability
Plan for Care homes for people age 65+ and for Domiciliary care for
people age 18+ for publication on the North Yorkshire County
Council website no later than 27 March 2023.
Decision Maker: Corporate Director of Health and Adult Services
Decision published: 27/03/2023
Effective from: 01/04/2023
Decision:
It was agreed to publish the Final Market
Sustainability Plan (MSP). Completion of the MSP is a condition of
the Market Sustainability and Improvement Funding Grant.
Lead officer: Abigail Barron
The purpose of this report is to explain the
use of E-Cigarettes as a harm reduction tool, to assist people to
stop smoking, when used as part of a comprehensive package of
support to individuals accessing the Living Well Smokefree
Service.
The decision is to award a contract for a supplier of E-Cigarettes
to be used as part of the service offer provided by Living well
Smokefree.
Decision Maker: Director of Public Health
Decision published: 27/03/2023
Effective from: 04/04/2023
Decision:
To award a contract for the supply of
e-cigarettes as a harm reduction tool to be used as part of the
Living Well Smoke Free Service offer.
Lead officer: Cath Simms
Decision Maker: Corporate Director of Strategic Resources
Decision published: 24/03/2023
Effective from: 24/03/2023
Decision:
To record the decision of GARY FIELDING to
take enforcement action under the Criminal Justice and Public Order
Act 1994 in accordance with his delegated powers contained within
the Council’s Constitution.
Lead officer: Louise Heaps
To seek agreement for NYCC to sign up to
deliver the Supporting Families Programme in 2023/2024, which will
allow the Chief Financial Officer to authorise the participation of
NYCC in the programme. This will enable the local authority to
receive the allocated funding.
Decision Maker: Executive Member for Children & Families
Decision published: 23/03/2023
Effective from: 21/03/2023
Decision:
To agree for NYCC to sign up to deliver the
Supporting Families Programme in 2023/2024 and 2024/2025, which
will allow the Chief Financial Officer to authorise the
participation of NYCC in the programme. This will enable the local
authority to receive the allocated funding
Lead officer: Barbara Merrygold
To seek approval for the initial deployment of
a small part of the fourth Household Support Fund (HSF) allocation
from the Department for Work and Pensions (DWP). DWP guidance
requires that local authorities offer support through the Household
Support Fund from 1 April 2023.
[A further report for decision will be submitted in due course,
with a delivery plan for the remaining HSF allocation.]
Decision Maker: Executive Member for Corporate Services
Decision published: 23/03/2023
Effective from: 23/03/2023
Decision:
To approve the initial deployment of a small
part of the fourth Household Support Fund (HSF) allocation from the
Department for Work and Pensions (DWP). DWP guidance requires that
local authorities offer support through the HSF from 1 April
2023.
A further report for decision will be submitted in due course for
Executive approval, with a delivery plan for the remaining HSF
allocation for 1 April 2023 to 31 March 2024.
Lead officer: Neil Irving
To authorise the acceptance of an offer for
external funding from the Public Sector Heat Decarbonisation Scheme
Phase 3b.
Decision Maker: Executive Member for Managing our Environment
Decision published: 22/03/2023
Effective from: 22/03/2023
Decision:
To authorise the Corporate Director -
Strategic Resources to accept the Public Sector Decarbonisation
Fund Phase 3b (PSHDS3b) grant, following confirmation that
NYCC’s application has been successful.
This funding stream is being made available by Government
department Business Energy and Industrial Strategy to assist the
decarbonising public sector properties heating. This particular
phase is aimed at assisting the removal of end of life gas and oil
boilers to be replaced by lower carbon technologies such as heat
pumps.
Lead officer: Kristina Peat
To seek approval from the Corporate Director -
Business and Environmental Services for the procurement of a
supplier to deliver an Energy Efficiency Scheme across North
Yorkshire
Decision Maker: Corporate Director of Business and Environmental Services
Decision published: 22/03/2023
Effective from: 16/03/2023
Decision:
Approval to carry out a procurement process to
source a supplier to deliver an Energy Efficiency Scheme across
North Yorkshire.
Not open to call in as Urgency Procedure applied.
Lead officer: Alison Dickinson
Decision Maker: Assistant Director - Resources (CYPS)
Decision published: 20/03/2023
Effective from: 09/02/2023
Decision:
To undertake a procurement exercise for the
refurbishment of design and technology facilities at The
Wensleydale School.
Lead officer: Julie Robinson
Decision Maker: Assistant Director - Resources (CYPS)
Decision published: 20/03/2023
Effective from: 09/03/2023
Decision:
To undertake a procurement exercise for an
extension to create a hygiene room and an external platform lift at
Richmond Methodist Primary School.
Lead officer: Julie Robinson
Decision Maker: Assistant Director - Resources (CYPS)
Decision published: 20/03/2023
Effective from: 13/03/2023
Decision:
To Award a construction contract to Hobson and
Porter Ltd at a value of £7,062,915.25 for construction of
new primary school for North Northallerton on land to the east of
the A167 Darlington Road, Northallerton.
Lead officer: Julie Robinson
Decision Maker: Assistant Director - Resources (CYPS)
Decision published: 20/03/2023
Effective from: 16/03/2023
Decision:
To undertake a procurement exercise for an
extension to the existing playground and associated drainage works
at Cowling Community Primary School.
Lead officer: Julie Robinson
Seeking approval to enter into a contract for
Adobe Connect licences, support and maintenance, utilising a Crown
Commercial Service led aggregation exercise to meet our
requirements for various Adobe licences, including Adobe Connect
licences.
Decision Maker: Assistant Director - Technology
Decision published: 20/03/2023
Effective from: 15/03/2023
Decision:
Seeking approval to enter into Contract with
Bytes Software Services Ltd for Adobe Connect licences, support and
maintenance.
Utilising a Crown Commercial Service led aggregation exercise to
meet our requirements for various Adobe licences, including Adobe
Connect licences.
Lead officer: Melanie Carr
Decision Maker: Assistant Director - Technology
Decision published: 20/03/2023
Effective from: 13/03/2023
Decision:
The Authority has awarded a contract to Code
Enigma to provide Drupal Website Hosting through GCloud 13
Framework.
The new contract is to commence on the 1 April 2023 for an initial
period of 36 months with the optional extension period of 12
months.
Lead officer: Julie Robinson
To explain the role of the North Yorkshire
Consolidated Planning Policy Framework presented at Appendix 1 to
the report and the Schedule of Planning Policy Evidence Base
Documents for North Yorkshire presented to Appendix 2 to the
report.
To ask the Executive Member For Planning to approve, as the
Council’s agreed position, the North Yorkshire Consolidated
Planning Policy Framework presented at Appendix 1 to the report and
the Schedule of Planning Policy Evidence Base Documents for North
Yorkshire presented to Appendix 2 to the report for publication on
the North Yorkshire Council’s website as soon as is
practicable.
Decision Maker: Executive Member for Culture, Arts & Housing
Decision published: 16/03/2023
Effective from: 24/03/2023
Decision:
The North Yorkshire Consolidated Planning
Policy Framework document presented at Appendix 1 and the Schedule
of Planning Policy Evidence Base Documents for North Yorkshire
attached at Appendix 2 of the report are approved and to be
published on the North Yorkshire Council's website as soon as
practicable.
Delegated authority is granted to Trevor Watson, Director for
Economy, Environment and Housing Harrogate BC (Assistant Director
for Planning at North Yorkshire Council from 1 April 2023) to make
any necessary minor amends and update each document as and when
necessary, before publishing to the North
Yorkshire Council’s website.
Lead officer: Melanie Carr
To consider the results of the funding
consultation undertaken with early years providers operating within
North Yorkshire and to approve recommendations to change the
funding rates paid to early years’ providers for the funded
entitlement for 3
Decision Maker: Corporate Director Children and Young People's Services
Decision published: 14/03/2023
Effective from: 22/03/2023
Decision:
To increase the provider base funded rate
for:
- the universal and extended funded entitlement for 3 & 4 year
olds from £4.31 per hour to £4.57 per hour for the
2023/24 financial year.
- disadvantaged 2 year olds from £5.51 to £5.64 for the
2023/24 financial year
Lead officer: Howard Emmett
To seek authorisation for NYCC (through the
York and North Yorkshire Local Enterprise Partnership) to submit an
Expression of Interest to access up to £650,000 of Revenue
funding and £350,000 Capital funding from Defra.
Decision Maker: Executive Member for Managing our Environment
Decision published: 14/03/2023
Effective from: 23/03/2023
Decision:
That:
i. The submission of an Expression of Interest by NYCC for grant
funding of up to £1million (max. £650,000 revenue and
£350,000 capital) covering two financial years 2023/24 and
2024/25 be authorised;
ii. Approval of the final content of the Expression of Interest be
delegated to the Corporate Director - Business and Environmental
Services;
iii. Acceptance of any grant funding offered as a result of this
Expression of Interest be delegated to the Corporate Director -
Strategic Resources following consultation with the Corporate
Director - Business and Environmental Services and the Assistant
Chief Executive (Legal and Democratic Services), subject to
acceptable terms and conditions being received.
Lead officer: Hugh Clearhill
To approve a variation and extension to the
contract for Community Mental Health Services
Decision Maker: Corporate Director of Health and Adult Services
Decision published: 14/03/2023
Effective from: 20/03/2023
Decision:
To extend the Community Mental Health Services
contract for an additional 24 months to 30 September 2025. To begin
work as soon as possible to explore the re-procurement of a new
service, including consideration of a public engagement exercise
and collaborative commissioning opportunities with
Health.
Lead officer: Sally Anderson
To consider a series of proposals around
Shared Lives systems and processes to be potentially implemented as
part of the new Shared Lives Operating Model commencing 1st
November 2023.
Decision Maker: Corporate Director of Health and Adult Services
Decision published: 14/03/2023
Effective from: 20/03/2023
Decision:
It has been agreed to procure the Shared Lives
Scheme with a revised operating model which includes an evaluation
tool to support assessment for new placements with refined payment
terms for Shared Lives Carers
Lead officer: Adam Gray
To review future arrangements for the
Trailblazer Programme in light of the announcement by the
Department of Health and Social Care that the programme is to be
paused.
Decision Maker: Corporate Director of Health and Adult Services
Decision published: 14/03/2023
Effective from: 20/03/2023
Decision:
The Corporate Director for Health and Adult
Services in consultation with the Corporate Director Strategic
Resources and Executive Member for Health and Adult Services noted
the formal ending of the Trailblazer Programme. It was agreed that
some work which began as part of the project will continue where
appropriate, and within existing budgets, to ensure that lessons
learned during our participation can help to deliver value for
money in service provision.
Lead officer: Anton Hodge
Decision Maker: Corporate Director of Business and Environmental Services
Decision published: 13/03/2023
Effective from: 09/03/2023
Decision:
The Council agreed to recommend acceptance of
grant funding from the Local Electric Vehicle Infrastructure (LEVI)
Capability Fund and delegated the Corporate Director - Strategic
Resources to accept the funding of up to £88,920 and
thereafter submit a proposal to the Department for Transport in
respect of expenditure of the grant in line with the Memorandum of
Understanding.
Lead officer: Tricia Richards
To determine requests made by certain
district/borough councils under section 24 of the Local Government
and Public Involvement in Health Act 2007 regarding Chief Executive
settlement agreements.
Decision Maker: Leader
Decision published: 09/03/2023
Effective from: 09/03/2023
Decision:
The Leader has granted Section 24 consent for
the Chief Executive settlement agreements for Craven District
Council, Harrogate Borough Council, Richmondshire District Council,
Ryedale District Council and Selby District Council on the terms
agreed in their respective Councils’ reports.
Lead officer: Barry Khan
Decision Maker: Head of Practice and Personalisation Children and Families
Decision published: 08/03/2023
Effective from: 04/11/2022
Decision:
The Authority has awarded a contract to ME
Learning for the Digital Staff Training for Liquidlogic Solutions
through GCloud 13 framework.
The new contract is to commence on the 1 April 2023 for an initial
period of 36 months with the optional extension period of 12
months.
Lead officer: Julie Robinson
To seek approval to accept the conditions set
by the Department for Education in relation to the Council’s
successful bid for inclusion in the Special Free School
programme.
The proposed school is to be located based in Northallerton and
would support young people with significant SEMH needs in the
Hambleton / Richmondshire area.
Decision Maker: Executive Member for Education, Learning & Skills
Decision published: 07/03/2023
Effective from: 07/03/2023
Decision:
To approve, following a successful application
to the Department for Education, the acceptance of the conditions
offered to establish a new Special Free School in Northallerton at
the Grammar School Lane site
Lead officer: Chris Reynolds
This is for approval of the grant forms to
participate a 5 year Nuffield funded research project looking at
the progress and life experiences of care leavers.
The funding is for a part time data person to facilitate the data
sets for the research project. Year 1 was set up from year 2 active
research. ( £33,750 x 4 years = 135k in total)
Decision Maker: Executive Member for Children & Families
Decision published: 07/03/2023
Effective from: 15/03/2023
Decision:
To approve the acceptance of the £135,00
grant funding from the Department for Education for delivery of
this digital and data grant programme
Lead officer: Samantha Clayton
To agree the High Needs Budget for 2023-24,
setting out the financial pressures and funding available for
expenditure that fall within the High Needs Block of the Dedicated
Schools Grant.
Decision Maker: Corporate Director Children and Young People's Services
Decision published: 07/03/2023
Effective from: 15/03/2023
Decision:
To approve the proposed High Needs Block
budget as set out in section 3.1 of the report.
Lead officer: Howard Emmett
Approval to consult on the de-designation a small number of Children’s Centres. There are a total of 5 buildings. Statutory guidance from the Department for Education means that recipients must have regard to it when carrying out duties relating to children’s centres under the Childcare Act 2006. Any building currently registered as a designated children’s centres will need to be de-registered with the DfE following the de-registration guidance. The guidance recommends consultation with stakeholders prior to any change. Although all these centres have been closed since the pandemic and not re-opened there remains the need to follow the Statutory guidance.
Decision Maker: Executive Member for Children & Families
Decision published: 07/03/2023
Effective from: 15/03/2023
Decision:
To commence a public consultation on the
de-commissioning and closure of five designated Children’s
Centres, namely:
•Kirkbymoorside Children’s Centre
•Eastfield Children’s Centre
•South Craven Children’s Centre (Glusburn)
•Wensleydale Children’s Centre (Askrigg)
•Nidderdale Children’s Centre (Pateley Bridge)
Lead officer: Barbara Merrygold
To agree fees to parents and schools for the
Music Service 2023/34
Decision Maker: Corporate Director Children and Young People's Services
Decision published: 07/03/2023
Effective from: 15/03/2023
Decision:
That for the financial year 2023/24 a 6 %
increase be applied to tuition fees. The effective date of the fees
change should be April 2023. Termly Fees and charges to apply from
April 2023 will be as follows:
Tuition in a group - £80.00
Individual tuition – 20 minutes- £156.30
Group of two – 30 minutes - £156.30
Individual tuition – 30 minutes- £219.50
Instrument Hire - Variable in line with value of instrument
That a 6% increase be applied to Music Centre fees to reflect
increased venue costs
Music Centre – full morning£68.50
Music Centre – part morning£54.90
.
That fee remissions relating to free school meals and working tax
credit remain unchanged.
Lead officer: Ian Bangay
To directly award a Multi Disciplinary
Consultancy Services Contract to Align Property Partners a wholly
owned Teckal Company of NYCC
Decision Maker: Assistant Director Strategic Resources
Decision published: 07/03/2023
Effective from: 15/03/2023
Decision:
To enter into a new Multi-Disciplinary
Consultancy Services Contract with a wholly owned Teckal Company of
North Yorkshire Council effective from 1st April 2023.
Lead officer: Howard Emmett
To agree the scheme for Locality Budgets
2023/24
Decision Maker: Executive Member for Corporate Services
Decision published: 06/03/2023
Effective from: 14/03/2023
Decision:
To approve the Locality Budget scheme to be
operated by North Yorkshire Council for the financial year
2023/24.
Lead officer: Neil Irving
Decision Maker: Shareholder Committee
Made at meeting: 14/02/2023 - Shareholder Committee
Decision published: 06/03/2023
Effective from: 14/02/2023
Decision:
There were no questions or statements from the public.
To provide an update on grant funding from the
Department for Transport (DfT) for the A59 Kex Gill scheme and
accept £5,883,739.00 of grant monies.
This represents reimbursement of project development life cycle
expenditure to date, to be paid this financial year ending 31 March
2023.
Decision Maker: Executive Member for Highways & Transportation
Decision published: 01/03/2023
Effective from: 28/02/2023
Decision:
Acceptance of A59 Kex Gill grant funding from
Department of Transport of £5,883,739.00 to reimburse project
development costs incurred by the Council up to Q3 2022/23.
Not open to call in as Urgency Procedure applied.
Lead officer: Richard Binks